Know which storage fits your workloads — before you buy.
You have a storage purchase or expansion ahead of you. The vendor recommends their array, and you can't tell whether it will suit your message queues, your databases and your archive alike. Get it wrong and the capital is tied up for years. The Storage Assessment gives you an independent, vendor-neutral answer: which technology fits which of your workloads, backed by your own metrics and by what we've run in production, and a PoC plan wherever the decision needs proof. Fixed scope, fixed price.
Three deliverables: where you stand, where you should be, and how to get there.
AS-IS
Where you stand today
- Interviews with your storage, platform and application owners, plus a structured questionnaire.
- An inventory of your storage backends (arrays and SAN, Ceph, LINSTOR, IBM Storage Scale) and what the systems running on them need: databases, virtual machines, file services, Kubernetes.
- Hardware, capacity and growth, the storage network and fabric, encryption and key management.
- Replication and snapshots, measured against the RPO and RTO you already set.
- An I/O profile for each workload class, taken from your own metrics.
- Versions, firmware and components past vendor support.
TO-BE
Where you should be
- A Storage Suitability Matrix: your candidate technologies against your workloads. What fits what and why, what not to use, and whether each option meets your security and group requirements.
- A target architecture: tiering, replication versus erasure coding, durability.
- Capacity variants, migration paths and a hardware BOM direction, not a vendor quote.
- A clear recommendation for every workload. Where a wrong choice would be costly and only a test can confirm it, you also get a PoC plan: success criteria, a test plan built from your real I/O profile and the estimated effort. The PoC itself is a separate step, and you decide whether it's worth running.
ROADMAP
How to get there
- Prioritized steps with effort estimates: what to do first, what it takes, what it's worth.
- The input for your purchase or your build, whoever runs it, so the next step starts from your data rather than a vendor proposal.
- A decision you can take to the board, not a shelf report.
Fixed scope, fixed price
One assessment, two levels
The deliverables are the same either way. What changes is the estate: more sites, more storage backends and latency-critical workloads take more work, and the price follows that.
Standard
excl. VAT · paid 50% at kick-off, 50% on delivery
Typically 4–6 weeks
Single-site environments
One site plus backup, up to two storage backends, no latency-critical workloads, and up to five workload classes profiled.
Full scope included — AS-IS, TO-BE and roadmap.
OrderEnterprise
excl. VAT · paid 50% at kick-off, 50% on delivery
Typically 6–8 weeks
Multi-site or latency-critical environments
Any one of these: several datacentres, a metro cluster or a remote DR site; three or more storage backends; latency-critical workloads such as message queues and transactional databases. Up to ten workload classes profiled.
Full scope included — AS-IS, TO-BE and roadmap.
OrderPlanning a new platform rather than changing one? Then the AS-IS starts from your requirements and the expected workload profile, and the tier follows the target environment. Either way, we confirm the tier with you in a 30-minute scoping call before you order.
What we need from you
Your own numbers, not a vendor benchmark.
- MetricsExports of storage and host metrics covering 7–14 days, within five working days of kick-off.
- A short collection, if neededIf latency, block sizes or fsync aren't collected today, a standard host-level collection (iostat, sar) for seven days. Without it, the profile is built from what your application owners tell us and marked as an assumption in the report.
- Your peopleTime with your storage, network and key application owners for the interviews.
Delivered in production
Assessments behind real decisions
Storage assessed and designed for a regulated bank and a satellite-data provider. Each one was the first step, not the whole engagement.
A storage assessment with a five-technology Suitability Matrix and a PoC plan, followed by a two-phase PoC that delivered a valid negative result.
A greenfield Ceph design with erasure-coded pools, SSD and HDD tiering and a capacity model for growth, plus a hardware BOM that saved thousands of euro.
Know which storage fits, and what to prove first.
A fixed-scope, vendor-neutral assessment: your workloads profiled from your own metrics, a Suitability Matrix, a target architecture and a PoC plan. Two clear prices. Most scoping calls take 30 minutes. No pitch, no deck.